Southwest Warren County Municipal Authority Water Reports and News

BOIL NOTICES

Boil Notice March 18, 2026

SWCMA - Loss of pressure Boil Water Noti[...]
Adobe Acrobat document [364.4 KB]

Reissued Boil Notice April 6, 2026

Reissued Boil Notice 4-6-2026.pdf
Adobe Acrobat document [74.1 KB]

Reissued Boil Notice April 16, 2026

Reissued Boil Notice 4-16-2026.pdf
Adobe Acrobat document [53.6 KB]

Reissued Boil Notice May 15, 2026

Re-Issued Boil Notice 5-15-2026.pdf
Adobe Acrobat document [88.4 KB]

Reissued Boil Notice June 15, 2026

Re-issued Boil Notice 6-15-2026 .pdf
Adobe Acrobat document [54.4 KB]

Reissued Boil Notice July 15, 2026

Re-issued boil notice 7-15-26.pdf
Adobe Acrobat document [54.2 KB]

Reissued Boil Notice August 14, 2026

Reissued Boil Notice 8-14-2026.pdf
Adobe Acrobat document [87.6 KB]

Reissued Boil Notice September 11, 2026

Re-issued Boil Notice 9-11-2026.pdf
Adobe Acrobat document [132.8 KB]

CURRENT WATER SITUATION UPDATES

Update August 13, 2026

The leak was confirmed on Scott Street Ext.  

Update July 27, 2026

The leak on Buckingham Street was repaired.  Thank you for the patience and understanding while the maintenance crew made the necessary repairs.  

Update July 24, 2026

A main line leak was detected on Buckingham Street.  The repair is scheduled for Monday, July 27, 2026, at 8:30am.  A call blast was sent to all customers that will be affected during the repair.

Update July 15, 2026

The maintenance on the intake at the plant was completed.  Filter 4 was returned to service.  

Update July 14, 2026

 

The maintenance crew has detected a leak on the recirculating line for the bridge.  The repair is scheduled for Thursday, July 16, 2026.   Filter 4 is still filtering to waste at this time.  The maintenance crew plans to put Filter 3 out of service next week for maintenance.  This will be the last Filter that will be assessed by the engineer.  

Update July 6, 2026

 

Filter 4 is out of service.  The maintenance crew is scraping the filter on July 6 & 7, 2026.   The filter is planned to return filter to waste for about a week and return to service when it is around 1 NTU. 

 

Update June 30, 206 and July 1, 2026

 

The maintenance crew have located another leak on Spruce Lane and the leak will be repaired on July 1, 2026.  

Operator Update June 16, 2026

 

Filters 1 and 2 have been scraped; filter 1 was filtered to waste for about a week and returned into service when it was around to a 1 NTU.  Filter 2 was scraped last week and filtered to waste until today.   

The authority is scheduled to repair at least 1 leak tomorrow and potentially 2 if the second leak is confirmed.

Current Conditions June 2, 2026:
WTP Flows: 138 gpm @ 615am
Contact Tank Level: 9.5’ Town Tank 11.8’
Ph 7.5 @ 13.2 Celsius.
WTP CL2: 1.84 mg/L
EP140 CL2: 1.57 mg/L

 

RAW 

Flow:

NTU:  2.42

Bay 1

Flow:  57.6 gpm 

NTU:  1.102  

Bay 2

Flow:  Out of Service

NTU:  Out of Service

Notes: Maintenance and assessment to be completed the week of June 1.

Bay 3 

Flow:  48.3 gpm

NTU:  1.380

Bay 4

Flow:  33.7 gpm

NTU:  1.672

 

CFE

1.436

 

Filter 2 maintenance and assessment

June 1, 2026

 

Filter 2 is out of service for maintenance. The maintenance and assessment
procedure of Filter 2 will take the remainder of the week. Filter 2 “Return to Service” date is expected Friday, June 4 /Monday, June 7.
The maintenance and assessment of filter 2 to include:
 1-2” of media removal (1200ft2)
 Excavation pits (minimum 3): identify location and extent of:
o Mottling
o Hardpan
o Deposition (if any)
o Location and thickness of support media.
o Filter fabric integrity and permeability. (percolation testing)
o Filter profile depth (30 locations)
 Filter to waste: at least one full filter volume and/or NTU < 1.0.
 Media analysis: NO, filter 1 was collected and sampled.

 

Filter 1 maintenance and assessment:
May 18 through May 23, 2026


Filter 1 was maintained and assessed during the week of May 18, 2026. Media samples were collected and sent to Hawk Mountain Laboratories for analysis. SWCMA & SMA are still awaiting results. A full filter 1 assessment report will be provided upon media analysis results.


Filter 1: Post Maintenance


Production:
SWCMA staff removed the top 1-2” of sand from the filter bed. The top of the filter captures most solids and turbidity from the source water. Over time the filter begins to plug and bind if the solids captured on top of the media are not removed.  
Filter 1 production capability was restored once the upper portion of the filter was removed.  Filter 1 production capabilities currently are 64 GPM (permitted rate).

Water Quality (Turbidity):
Following the May 18 maintenance event, Filter 1 was refilled and placed into
service. Production capabilities were immediately restored. Filtered flows from
filter 1 now achieve the design rates of 64+ gpm. Turbidity (clarity of water) readings have slowly improved since Filter 1 was placed into service. Operators expect continued turbidity improvement once adjacent filters are maintained.
Boil Water Advisory: SWCMA remains under a boil water advisory despite the overall conditions of the water system improving. Operators expect to petition the state to remove the boil water advisory following filter 2 maintenance.
Customer Demand: The SWCMA system continues to have unknown leaks. SWCMA should continue to look for and locate water main leaks. System water losses remain elevated.

Important Information About Your Drinking Water

The below letter was sent out to all water customers on July 16, 2026 as a separate mailing.  If you have any questions feel free to reach out to the office at 1-814-484-7424

Public Notice - 7-16-2026.pdf
Adobe Acrobat document [72.3 KB]
Public Notice - Total Coliform.pdf
Adobe Acrobat document [77.0 KB]

The below letter was sent out to all water customers on June 26, 2026 as a separate mailing.  If you have any questions feel free to reach out to the office at 1-814-484-7424

Southwest Warren Co 2025 CCR.pdf
Adobe Acrobat document [279.9 KB]
Public Notice Failure to monitor March 2[...]
Adobe Acrobat document [87.5 KB]
Public Notice Failure to monitor April [...]
Adobe Acrobat document [47.3 KB]

The below letter was sent out to all water customers with the June 2025 water/sewer/trash bills.  If you have any questions feel free to reach out to the office at 1-814-484-7424

SWCMA 2024 CCR.pdf
Adobe Acrobat document [562.4 KB]

The below letter was sent out to all water customer with the October water/sewer/trash bills.  If you have any questions feel free to reach out to the office at 1-814-484-7424.

Tier 2 PN 3rd quarter 2024 Annual Runnin[...]
Microsoft Word document [16.9 KB]

The below letter was sent out to all water customer with the August water/sewer/trash bills.  If you have any questions feel free to reach out to the office at 1-814-484-7424.

Tier 2 PN 3rd quarter 2024 Annual Runnin[...]
Microsoft Word document [16.8 KB]

The below letter was sent out to all water customer with the April water/sewer/trash bills.  If you have any questions free free to reach out to the office at 1-814-484-7424. 

Tidioute Tier 2 1st quarter.pdf
Adobe Acrobat document [327.5 KB]

The below letter was sent out to all water customers with the February water/sewer/trash bills.  If you have any questions feel free to reach out to the office at 1-814-484-7424.

Tier 2 PN 2023 Annual Running Average HA[...]
Microsoft Word document [16.4 KB]

Contact Information:

 

Tidioute Borough
129 Main St
Tidioute, PA 16351

Phone: (814) 484-7424

Fax: (814) 484-7412

Email address: tboro@tidioute.org

Tidioute Borough Office Hours

Mon-Fri :

08:00 am - 12:00 pm

Monday - Friday 1:00 pm - 3:30 pm is by appointment only. Please contact the office to schedule an appointment.

Directions

Get directions for your next visit to Tidioute, Pennsylvania.

Visit our Contact Us page to view google map or simply click the button below.

 

List of Council & Authority Members

Click on the Administration page for a complete list of Tidioute Borough Council members as well as Southwest Warren County Municipal Authority (SWCMA) members.

Events

Check out the Events page to find out what is going on in our beautiful town.

VOLUNTEER

Local Organizations Visit the local Organizations page to learn more about our local non profits and organziations within the Tidioute community. 

Print | Sitemap
© Tidioute Borough